INCINERATOR PLANT DEMOLITION

Project: Incinerator Complex
Client: Yorkshire Water
Location: West Yorkshire
Date: Duration: 14 weeks

Pre Project Commencement

  • New Client
  • Extensive Pre-Qualification and Tender period
  • Select Tender List
  • Water Industry
  • Cradle to Grave Process 

Scope of Works

  •  The project was for the Demolition of the Incinerator Complex at Yorkshire Water’s site.
  •  Ron Hull Demolition Ltd acted as a Sub-Contractor for the project
  •  Phase 1 – Tanks Demolition – A number of tanks were demolished on site including 6 sludge, 1 emergency storage and multiple strong liquor tanks
  •  Phase 2 – Incinerator Building – Soft strip works commenced ensuing the facility was ready for Demolition
  •  Phase 3 – Incinerator Building – The Chimney Stack was Dismantled and lifted down to be processed on site
  •  Phase 4 – Incinerator Building – Mechanical Demolition took place using Excavators and a 30m High Reach
  •  Phase 5 – Processing of all materials took place throughout the project with everything transferred to the Ron Hull Groups state of the art Recycling Centre 

Project Challenges

  • Tight deadlines to allow for future works on site
  • Complex structure for High Reach Demolition
  • Extensive planning and preparation for dismantling and craneage of Chimney Stack
  • Internal Explosive Demolition within Incinerator Building
  • Extremely close to the Railway